BleedingIvy
Ensign
Completely redone, new wiring, breaker box, hoses, cables, new steering, new battery charger, awlgrip paint, bilge detailed, degreased, sanded and painted with bilge coat paint, new twin aluminum saddle fuel tanks, barrier coated with fittings, hoses, water seperaters gaskets, new cockpit deck and supports, new Bomar front deck hatch, new LED lighting, new V berth cushions, new wheel house port passenger bench seat, new anodized aluminum grab rails through out , new anodized aluminum rocket launchers, upper and lower, new battery switches, interlux top side paint inside and out, new zincs , all running gear sanded and polished, new antennas , new sea glass front windows with custom fiberglass external window frames, water ballast keel for added rolling stability, dyvinicyl , rear cabin wall, commercial water tight deck hatches, all hardware removed and rebedded with 5200 marine sealant, new diesel fills and hoses, new anodized aluminum and ipa wood cabin ladder, redone commercial grade steering helm, new electronics panel on helm, boat was sanded by hand including bottom, awlgrip and barrier, bottom paint to be applied in next two weeks, as well as side windows and minor west system spots on topside..... Have Hurth transmission, uninstalled.... No motor at present time, have 3 options lined up..... To be installed over next 3 months










