New floor in 22sisu

nickyp

Captain
Joined
Nov 3, 2012
Posts
792
Likes
164
Location
bermuda
Boat Make
20ft dyer
Nidacore glassed on underside and stuck down to joists to take camber

image.jpg
 

JimRP31

Rear Admiral
Joined
Oct 21, 2011
Posts
1,258
Likes
379
Location
tiverton RI
Boat Make
Willis Beal/RP 31
How many hours do you think it took you for the entire project?
 

nickyp

Captain
Joined
Nov 3, 2012
Posts
792
Likes
164
Location
bermuda
Boat Make
20ft dyer
How many hours do you think it took you for the entire project?
Budgeted for 2 weeks of 40 hr weeks start to finish
I thought that would be easily done.
Not so much
Really pushing it.
Buttoning it up has taken longer that thought. Just rerouting bilge pumps hose, glassing in conduit for the batteries and fuel tanks (which live under the gunwales) and would not fit so easy because the new floor is 1/4" higher than the old one. Trimming his old panels that hide the fuel tanks and batteries, that no longer fit because the floor is now 1/4" higher. And So on and so on
So 2 weeks is about right. Materials ran a bit high. All the small stuff that adds up
 

nickyp

Captain
Joined
Nov 3, 2012
Posts
792
Likes
164
Location
bermuda
Boat Make
20ft dyer
Looks nice.
Wondering what size Nidacore you used, 3/4 1" 1 1/2 ?
3/4
Only 1 layer of biax on either side due to budget constraints.
But, I'm 6'2 220 lbs, and can stomp all over it with no bounce.
The boat only gets really light use .
I would have loved to lay it up heavier, but.....
 

nickyp

Captain
Joined
Nov 3, 2012
Posts
792
Likes
164
Location
bermuda
Boat Make
20ft dyer
Thanks for all the supportive comments.
The owner never came by or called once, so has no idea the effort that goes into such a 'simple' job.
 